Heavy Cranes 250 – 1250 tonne capacity
Choose from the list below for more information on our fleet of heavy cranes:
- Liebherr 1250te Class LG1750
- Liebherr LG1550
- Liebherr LTM 11000D
- Demag AC1000-9/2
- Liebherr LTM 1800
- Liebherr LTM1750 8.1
- Liebherr LTM1650-8.1
- Liebherr LTM 1500-8.1
- Liebherr LTM1450
- Liebherr 400 te Class LTM 1350-6.1
- Grove 350Te class GMK6300L-1
- Grove 300Te Class GMK6300L
- Grove GMK5250XL
- Grove GMK5250L 250te – 5 axles
- Liebherr MK140 Mobile Tower Crane
Our Heavy cranes operate from strategic locations throughout the UK to provide our customers with an efficient, cost-effective solution, minimising transportation times and maximising working time on site. Our highly experienced engineering teams provide tailored solutions to your lifting requirements.
It is strongly recommended that our highly trained and experienced engineering and technical planning teams are employed to plan and organise your lifting operation. Utilising heavy cranes requires specialist knowledge to ensure a safe and accurate service delivery. With our get the job right, get the job done attitude we always recommend a fully controlled and insured CPA Contract Lift to ensure the lifting processes on your projects and developments run as safely and smoothly as possible.
Heavy Cranes has a bank of suitably trained and qualified individuals and teams that can be hired or called upon to assist in fully controlled contract lifts.
Available competent people:
-
Appointed Person (as described in BS7121 pt1 General) –
The person responsible for the safe planning, control and execution of the lifting operation and producing the safe system of work (Method Statement)
-
Lift / Crane Supervisor –
The person responsible for supervising the lifting operation and safely operating the safe system of work (Method Statement)
-
Slinger Signaller –
The person responsible for attaching / detaching the load to and from the crane and directing crane movements during the lifting operation.
Please be aware that supporting heavy transport is required when delivering plant of this size and complexity, There must be sufficient room for the delivery of ancillaries when setting up these machines.